What WE DID:
- Conceived and created a well-defined prototype qualified to the Technical Readiness Level 4.
- Built and life tested a compliant prototype to support the validity of the replacement decision.
The Environments:
- Air
The challenge requirements:
- Price competitive solution with a high-power density, small package size, specified performance, and high reliability in extreme environments.
Our approach:
- Trade studies were utilized to weigh the benefits of various configurations.
- Build and prove our analytical results through testing.
The Solution:
- Created a prototype that satisfies the performance requirements of the application.
- Ingenium continues work with the client through product analysis, detailed engineering studies, and prototype testing moving toward a fully flight worthy solution.